September 16, 2020 Regular Meeting
IWWC#20-18 Location: 109 Mundry Road Proposal: Septic and Well Approval.
IWWC#20-27 - 500 East Wakefield Boulevard Proposal: Repair Existing Lake Wall.
IWWC#20-31 - 240 Perch Rock Trail Proposal: Install Permeable Pavers for Parking Area.
IWWC#20-33 - 134 Shore Drive Proposal: Knock Down and Rebuild Cottage.
IWWC#20-34 - 622 East Wakefield Boulevard Proposal: Repairs to Stone Lake Wall and Pier.
IWWC#20-35 - 116 Sucker Brook Road Proposal: Excavating within a Wetlands and Upland Review Area.
IWWC#20-41 758 East Wakefield Boulevard Proposal: Repair and Relocate Pier; Register Dock.
IWWC#20-42 428 East Wakefield Boulevard Proposal: Repair Top 2’-3’ of Lake Wall; Remove Jet Ski Launch; Remove Lake Front Stone Patio and Replace with Lawn; Repair Lake Steps Leading into Water; Remove and Replace Two Steps of Concrete/Stone Steps; Extend Lower Block Retaining Wall; Add Shed.
IWWC#20-43 332 East Wakefield Boulevard Proposal: Remove and Replace Sea Wall and Dock Superstructure.
IWWC#20-44 812 East Wakefield Boulevard Proposal: Replace Lake Wall.
